Griffin Partners
Project visualisation of Griffin Logopark Almaty — overall view of the complex

Project visualisation

Griffin LogoparkAlmaty

Class A+ logistics park at the junction of the A3 Almaty highway and Al-Farabi Street. 125 428 m² of warehousing on a 20 ha site — lease or built-to-suit.

Phase A · Planned completion — end of Q2 2027

125 428m²20 ha · Phases A and B

6 315m²
minimum unit
12m
clear height
8t/m²
floor load

Designed for

  • Distribution and FMCG

    A regional warehouse on the A3: HGV traffic reaches the network without entering central Almaty.

  • 3PL and operators

    A whole unit from 6,315 m², docks and specified class A+ building services.

  • Fulfilment

    Inside BAKAD, 3.7 km from the city’s northern edge.

Logistics uses the unit is designed for — not a list of occupiers at this park.

Typical unit dock court — project visualisation
Project visualisation

Quality is in the decisions

  • Considered transport access

    A3 · 1 km to BAKAD · northern edge of Almaty

    Location and access
  • Contemporary building services

    ESFR 25 · 4.5 MW · boiler plant in the building

    MEP systems
  • In the context of Almaty’s growth

    3.7 km to the city boundary · 13.5 km to ALA

    The surroundings

Space for your operation

Eight units in Building A. One occupier per unit; subdivision is not offered. Availability and terms are confirmed with the project team.

Building A layout: eight units

Building A layout · Project visualisation

All units and specifications

At the crossing of logistics routes

Ile AlatauAlmatyAl-FarabiABSite1,0 km3,7 kmALA13,5 kmA3BAKADNSiteA3BAKADAl-FarabiNot to scale
Location diagram, not to scale

Inside BAKAD, on the A3: a direct slip road onto the highway, HGV traffic does not enter the centre. 3.7 km from Almaty’s northern edge.

  • 1.0 kmBAKAD

    A3 service road and a ring-road exit.

  • 13.5 kmAlmaty Airport (ALA)

    Direct access via the A3.

  • 3.7 kmNorthern boundary of Almaty

    The site sits at the city edge.

Aerial of the construction site, September 2026
Construction photograph · Status as of 15 September 2026

A project under construction

Foundation works continue: the pocket grid is in place, column cages are being installed, grade-beam cages are assembled. Pavement is being laid along the access road.

Planned completion of Phase A — end of Q2 2027

Griffin Partners

Developer and asset manager since 1998. Class A assets across commercial, hospitality, industrial, residential and mixed-use real estate.

Building 1 at Volzhsky Industrial Park

Completed developer project

Volzhsky Industrial Park

Nizhny Novgorod Region, Russia · 65 000 m²

Investor, developer, asset manager

Sherizon-Nord warehouse at Sheremetyevo Airport

Completed developer project

Sherizon-Nord

Sheremetyevo airport zone, Moscow Region · 55 170 m²

Investor, developer, asset manager

Eurasian Development Bank

Project finance partner

Eurasian Development Bank — credit partner for construction of the first phase.

Request terms for your brief

The form captures area, term and format. On this demo, the message opens in your mail client — the commercial director reads it.

Pre demo: no server accepts the form. The message is sent through your mail client.